Applied Digital Corp.

Applied Digital Corp. (APLD) Q1 FY2027 Earnings Review

APLD·Q1 FY2027·
HPC HostingTenant Fit-OutPolaris Forge 1

EPS actual

Beat
-0.01+96.6%

Est. -0.3

EPS

Revenue actual

Beat
341.88M+194.0%

Est. 116.29M

Revenue

Executive Summary & TL;DR

Headline Metrics & Consensus Comparison:

  • Revenue: $341.88M vs. consensus of $134.10M (Beat by $207.78M / +155% vs. estimate; +322% YoY vs. $80.93M in Q1 FY2026).
  • GAAP EPS: $(0.76) vs. GAAP consensus of -$0.30 (Miss by $0.46, driven by non-cash derivative losses, stock-based compensation, and debt service expense).
  • Non-GAAP EPS: $(0.01) vs. non-GAAP consensus of -$0.26 (Beat by $0.25).
  • Guidance Direction: Not Issued (Company does not provide formal numeric revenue or EPS quarterly guidance ranges).

Key Takeaways:

  1. Revenue Hyper-Growth: Top-line growth was powered by $157.2M in tenant fit-out services revenue and the commercial launch of HPC hosting rentals ($79.1M total rental revenue), alongside $23.0M in GPU hardware sales at ChronoScale.
  2. Profitability Bifurcation: Non-GAAP Adjusted EBITDA rose to $64.4M (vs. $0.5M in Q1 FY2026 and $42.4M in Q4 FY2026). However, GAAP net loss expanded to $(221.0M) due to $49.5M in derivative fair value losses, $11.4M in investment losses, $77.4M in interest expense, and a $51.7M increase in stock-based compensation.
  3. Capacity Ramping: Live capacity at Polaris Forge 1 expanded from 175 MW as of August 31, 2026, to 250 MW on October 2, 2026. Total contracted IT load stands at 1.4 GW with ~$36.2B in base-term lease backlog.
  4. Balance Sheet Expansion: Total debt increased by $1.40B quarter-over-quarter to $6.40B following a $1.59B senior secured note issuance, elevating quarterly interest expense to $77.4M.

Analyst Stance & Rationale: Constructive. The underlying operational engine is delivering rapid capacity growth and contract execution ($36.2B backlog). While debt leverage and GAAP net losses remain elevated, non-GAAP core profitability (Adjusted EBITDA of $64.4M and HPC NOI of $58.8M) demonstrates strong unit economics as campuses move from construction to live hosting.